首页 防火测试中心 刷新 返回 登录
ASTM D5364燃煤单位玻璃纤维增强塑料烟囱衬里设计,制造及安装标准导则
日期:2012-02-07 17:57
surance procedures are developed for the design, fabrication, and erection phases. The quality-assurance program defines the proper authority and responsibility, control of design, material, fabrication and erection, inspection procedures, tolerances, and conformity to standards. The quality-control procedures provide the steps required to implement the quality-assurance program.
1.8 Appendix X1 includes research and development subjects to further support recommendations of this guide.
1.9 Di

5/12 下一页 上一页 首页 尾页

防火测试中心


返回 刷新 WAP首页 网页?/a> 登录
08/28 23:31
½ www.400ai.com www.50ppp.com www.zzz13.com ڷƱ ݷƱ Ʊ ɳ˽̽ ɳվŻ