首页 防火测试中心 刷新 返回 登录
NFPA 214 水冷却塔标准
日期:2012-02-10 14:14
ation
(2)* Size and construction of tower
(3) Type of tower
(4) Location of tower
(5) Water supply
(6) Value of tower
(7) Climate
(8)* Water delivery time
(9) Environment
(10) Rooftop towers
(11) Limited access
(12) Construction of materials (See 1.1.3.)
1.1.3 Construction Materials of Cooling Towers. When the cooling towers' structure, fan and distribution decks, louvers, and fill materials are all of noncombustible materials, no fire protection is required. If any of these are combus

2/5 下一页 上一页 首页 尾页

防火测试中心


返回 刷新 WAP首页 网页?/a> 登录
08/29 13:43
½ www.400ai.com www.50ppp.com www.zzz13.com ڷƱ ݷƱ Ʊ ɳ˽̽ ɳվŻ