首页 防火测试中心 刷新 返回 登录
NFPA 20 固定式消防泵安装标准
日期:2012-02-10 14:05
ceptance tests and operation.
1.1.3 This standard does not cover system liquid supply capacity and pressure requirements, nor does it cover requirements for periodic inspection, testing, and maintenance of fire pump systems.
1.1.4 This standard does not cover the requirements for installation wiring of fire pump units.


Update to the 2010 NFPA 20 to get the latest installation requirements for fire pumps.
Head off system failure and malfunctions with the 2010 edition of NFPA 20 Standard for t

2/4 下一页 上一页 首页 尾页

防火测试中心


返回 刷新 WAP首页 网页?/a> 登录
08/29 18:21
½ www.400ai.com www.50ppp.com www.zzz13.com ڷƱ ݷƱ Ʊ ɳ˽̽ ɳվŻ