NFPA 1914 消防队登高设备试验标准
日期:2012-02-10 11:34
ctive testing (NDT) and is required to be done at least every 5 years and whenever the visual inspection or load testing indicates a potential problem or there is a desire to further confirm continued operational safety.
Major changes to the 2002 edition of NFPA 1914 include
Clarified qualifications of inspection and testing personnel
Added inspection requirements for some components that were not covered previously
Editorially revised wording to clarify the intent of requirements
(Approx.
3/4 下一页 上一页 首页 尾页
返回
刷新
WAP首页
网页?/a>
登录
08/30 06:36