首页 防�测试中心 刷新 返回 登录
NFPA 780 �雷系统安装标准
日期:2012-02-09 10:28
ection system installation requirements for the following
(1) Explosives manufacturing buildings and magazines
(2) Electric generating, transmission, and distribution systems
1.1.3 This document shall not cover lightning protection system installation requirements for early streamer emission systems or charge dissipation systems.
A.1.1.2 Electric generating facilities whose primary purpose is to generate electric power are excluded from this standard with regard to generation, transmission,

2/6 下一页 上一页 首页 尾页

防�测试中心


返回 刷新 WAP首页 网页�/a> 登录
11/02 09:04
³¬¼¶±øÍõ×îÐÂÕÂ½Ú www.400ai.com www.50ppp.com www.zzz13.com ÉîÛÚ·¢Æ± ËÕÖÝ·¢Æ± ÉòÑô·¢Æ± ³¤É³Ë½¼ÒÕì̽ ³¤É³ÍøÕ¾ÓÅ»¯ ºÚÁ´¹ºÂò