ASTM F1994船载固定泡沫灭火系统标准试验方法
日期:2012-02-08 13:49
rpretation of Results:
Leakage at any piping system mechanical joint that is corrected on-the-spot is not cause for test rejection.
Any erratic operation detected in the zone control valves, seawater sprinkling pump discharge bypass-overboard valves, or control devices is cause for rejection of the test. The component causing the erratic operation shall be repaired or replaced and a retest performed.
Any operation which does not meet the pass/fail criteria defined by the test procedure(s) is ca
6/15 下一页 上一页 首页 尾页
返回
刷新
WAP首页
网页?/a>
登录
09/13 05:13