首页 防火测试中心 刷新 返回 登录
ASTM E2570 评定外墙外保温及防水装饰系统或带排水装置的外墙外保温及防水装饰系统用防水层的试验方法
日期:2012-02-08 13:41
ply to trowel, roller, or spray applied Water-resistive barrier (WRB) coatings that are applied over exterior sheathing prior to application of EIFS or EIFS with drainage wall claddings.
1.2 Test methods for in place wall system and cladding related to tests such as fire resistance, wind load capability, air barrier performance, and so forth. should also be considered but are outside the scope of this document.
1.3 The values stated in SI units are to be regarded as the standard. The values give

3/7 下一页 上一页 首页 尾页

防火测试中心


返回 刷新 WAP首页 网页?/a> 登录
12/25 14:44
½ www.400ai.com www.50ppp.com www.zzz13.com ڷƱ ݷƱ Ʊ ɳ˽̽ ɳվŻ