首页 防火测试中心 刷新 返回 登录
ASTM C1015 纤维素和矿物纤维松充填热绝缘料装配的标准规范
日期:2012-02-08 12:10
ulation in a safe and effective manner. It must be noted that actual conditions in existing buildings vary greatly, and in some cases substantial additional care and precaution must be taken to ensure effective and safe installation.
1. Scope
1.1 This practice covers procedures for the installation of cellulosic and mineral fiber loose-fill insulation in ceilings, attics, and floor and wall cavities of new or existing housing and other framed buildings.
1.2 This practice applies only to the inst

3/7 下一页 上一页 首页 尾页

防火测试中心


返回 刷新 WAP首页 网页?/a> 登录
09/15 10:09
½ www.400ai.com www.50ppp.com www.zzz13.com ڷƱ ݷƱ Ʊ ɳ˽̽ ɳվŻ